| Lifecycle Planning for Highway Structures | LoBEG have developed a Good Practice Guide (GPG) that describes the step-by-step approach for structure specific lifecycle planning and Whole Life Costing. A Microsoft excel proof-of-concept model that enables asset managers to undertake lifecycle planning for individual structures, has also been developed. This model is accompanied by a comprehensive User Guide that provides step-by-step guidance on using/operating the model. | | LoBEG Publications | | Good Practice Guide | Model | Model: User Guide |  |  |  | | Model: Populated Example | | |  | | |
| | | | Maintenance Prioritisation for Highway Structures: Phase 1 | LoBEG have developed a Good Practice Guide (GPG) that sets out a risk based prioritisation process for analysing raw inspection data and sorting it in order of priority (at element level). The process is intended to support bridge engineers in reviewing large quantities of inspection data and creating schemes of work. A Microsoft excel proof-of-concept model that enables asset managers to prioritise element specific maintenance needs, has also been developed. | | LoBEG Publications | | Good Practice Guide | Model | Model: Populated Example |  |  |  |
| | | | Creating Consistent Element Inventories for Highway Structures | Consistency is vital to current and developing Bridge Management Techniques and to ensure that these are suitably supported, it is essential that element inventories are created and maintained in a consistent manner. LoBEG have developed a Good Practice Guide (GPG) that describes the approach for creating consistent element inventories and provides guidance on consistent evaluation of Bridge Condition Indicators. | | LoBEG Publications | | Good Practice Guide | | |  | | |
| | | | Asset Valuation for Highway Structures | LoBEG have produced a Technical Note that explains how the CSS Asset Valuation guidance (including Depreciation and Gross Replacement Cost) has been interpreted and applied in London. The Depreciation approach described in the Technical Note is based on the Guidance Document for Highway Infrastructure Asset Valuation published by the Roads Liaison Group and has now been superseded by the CIPFA code of practice. However, the Gross Replacement Cost approach described in the technical note is still current. | | LoBEG Publications | | Technical Note | | |  | | |
|
|